Total Environmental Kooling design and install a full range of specialised Close Control rooms, Clean Rooms, Thermal Rooms and CMM Rooms for Engineering, Quality Control, Manufacturing and other applications. We can modify and improve existing rooms or build entirely new rooms depending on client requirements.

We are experts in this field. We can design all rooms to your required size, layout and required temperature, humidity and air flow parameters. Please call us to discuss your detailed requirements and for further information on the projects that we have carried out, or have a look at our specialist room FAQs.

close control room installed by TEKClose Control, CMM Rooms, Cleanrooms, Thermal Rooms

We have undertaken specialist Close Control, CMM, Thermal Room and Clean Room projects (including all building services) in Scandinavia, Singapore and throughout the UK. We have significant expertise in design in this area for Blue Chip PLC clients such as Rolls Royce and Renishaw.

Our experience of all types of control room installation has been gained over a 20 year period. Our in house design experts and professional, highly experienced engineers have worked to perfect our methods of constructing precise temperature and humidity controlled rooms. We have also designed the air diffusion modules to achieve the required coverage within the close control facility.

Our team can build the entire room including all aspects of the close control environment as a complete turnkey package (including all building works, mechanical and electrical services). We can provide you with budget costings and design input from an early stage in the project. Client references can be provided on request.

CMM Room, Daventry

Our team recently completed a CMM room for an Engineering Group in Coventry to house equipment. This is successfully working to within 0.2° as demonstrated by data logs.

Close Control Turnkey Project in Norway, completed early

Total Environmental Kooling were appointed by a major metrology manufacturer to design, supply, install, commission and set to work a close control metrology facility at a multi-national marine engineering site in Norway.

Having agreed the design, all components were shipped to Norway, where our team of specialist builders, electricians and air conditioning engineers constructed the 13 by 8 metre chamber and fitted the ventilation ductwork and base electrical services by 23 July, a month ahead of programme.

Commissioning took place in mid-August, following the installation of the specialist measuring equipment for which the facility was designed.

The space is controlled at 20°C +/- 1°C and humidity at 45% +/- 10%.