TEK at Trescal, Derby

Trescal are global leaders in their field of high-end dimensional calibration and measurement and work in the Aerospace, Automotive, Electronics and Pharmaceutical sectors. They have recently relocated to a new facility in Derby which required two new high accuracy calibration rooms.

The close control air conditioning system was designed and installed by TEK. The new measuring rooms were required to meet a certain specification or classification which would suit an environment where sensitive measuring equipment could be used. This would enable the high accuracy work to continue uninterrupted. The specification for temperature and humidity was to be controlled at 20°c+/-1°c with relative humidity no more than 55%.

TEK’s vast experience and numerous ‘Blue Chip’ client base within the close control air conditioning market meant that they were approached to offer the complete solution to the new facility.

Through the years, TEK have formulated a careful and precise design to assist the needs of the client, understanding the importance of selecting the precise room structure and air conditioning plant to suit the specific needs of the facility.

Trescal’s requirements

For this project, the rooms were built utilising insulated panels for the walls and the roof. The nature of this ‘sealed’ unit enabled TEK to ensure that the environmental conditions within the space were able to be maintained. Airlocks for goods entry and for personnel entry were provided. The goods entrance utilised rapid roller doors which were controlled via interlock capability.

Double glazed Windows were installed to the facility to accommodate a viewing area for visitors to look at the ‘state of the art’ calibration lab. Once the room had been constructed the air conditioning plant was installed.

With the room structure completed and the air conditioning plant and associated ductwork installed, the lighting and electrics could be positioned. The lighting utilised state of the art efficient L.E.D light fittings and the general electric layout and requirements were installed as specified by the client. In addition to the lighting and electrical work as part of TEK’s turnkey solution, all other services such as Compressed air, fire alarm, phone & data cables were installed.

Validation Process

On completing the full installation, all aspects of the project were commissioned. The A/C plant was then left running so that a thorough validation process could take place. The validation involved using certified ‘Tiny Tag’ measurement sensors. These were positioned around the room to monitor both the temperature and the humidity. The data was then collected at regular intervals and downloaded in text and graphical formats before final handover to the client.

To date, TEK have designed and installed numerous turnkey calibration and high accuracy facilities for clients in the scientific, automotive and aerospace industries. We continue to get results and maintain temperatures within a 0.2°c – 0.5°c where our specification/brief is 20°c+/-1°c.

Our knowledge and expertise, with our desire for continued professional design and development, has seen us go from strength to strength and be a leading installation company for ‘Turnkey’ close control air conditioning facilities. TEK have installed facilities throughout the UK and overseas, including Norway and Singapore. In addition, TEK can advise on existing facilities installed by others that may be underperforming and carry out rectification works where possible to bring the room up to the client’s required standard.

For more information on close control room installation, please call us on 0117 952 3355 or fill in our contact form and we will call you back.

Back

Our Services

Air Conditioning Installation

Total Environmental Kooling are an established independent mechanical and electrical contracting company in Bristol offering a complete design, supply and installation service for air conditioning, climate control systems, ventilation and heat pumps.

Air Conditioning Maintenance and Servicing

We have an excellent maintenance team and provide full back up to all industrial and commercial clients including emergency air conditioning and climate control repairs, servicing, fault finding and regular planned maintenance visits.

R22 Replacement

Total Environmental Kooling carry out R22 site surveys and design and install R22 replacement solutions, in order to meet the ban on R22 refrigerant that was introduced in January 2015. We have the answers to your common queries on the legal requirements and implications on your business on our FAQ R22 page.

Bespoke Systems, Close Control, CMM, Thermal Rooms and Cleanrooms

We have extensive experience of designing and building Close Control, Cleanroom, Thermal rooms and CMM room facilities to very tight temperature and humidity control for many blue chip plc clients, including Rolls Royce plc and Renishaw plc. We can also improve existing facilities and retro fit systems to meet client requirements. We have carried out these projects in Bristol and Gloucester, the UK and worldwide.

Heating Systems

Total Environment Kooling Ltd provides services throughout the UK and overseas. We design, install, service and maintain systems for domestic, commercial and industrial sector.