Total Environmental Kooling

Commercial

Maintenance & Service

Domestic

Design and Quality

MCS Approved

Design and Quality

MCS Approved

Year round comfort

UK Sourced Products

Renewable Energy for a greener future

Total Environmental Kooling Ltd.
Commercial Services
Maintenance
Domestic Services
APPROVED INSTALLER
Maintenance

Air Conditioning Energy Assessments

Total Environmental Kooling design and Install a full range of specialised Close Control rooms, Clean Rooms and CMM Rooms for Engineering, Quality Control, Manufacturing and other applications. We can modify and improve existing rooms or build entirely new rooms depending on client requirements.

 

We can design all rooms to your required size, layout and required temperature, humidity and air flow parameters.  Please call us to discuss your detailed requirements and for further information on the projects that we have carried out.

 

Close Control, CMM Rooms

We have undertaken specialist Close Control, CMM and Clean Room projects (including all building services) in Scandinavia  and throughout the UK.  We have significant expertise in design in this area for Blue Chip PLC clients.

 

Our design and build experience of CMM, Close Control rooms, Laser Labs etc has been gained over a 20 year period, with our in house design experts and professional, highly experienced engineers working to enable tight humidity and temperature controls to be achieved.  We have also designed the air diffusion modules to achieve the required coverage within the close control facility.

 

Our team can build the entire room including all aspects of the close control environment as a complete turnkey package (including all building works, mechanical and electrical services). We can provide you with budget costings and design input from an early stage in the project. Client references can be provided on request.
 

CMM Room, Daventry

 

Our team recently completed a CMM room for an Engineering Group in Coventry to house CMM equipment.  This is successfully working to within 0.2° as demonstrated by data logs.

 

Close Control Turnkey Project in Norway, completed early

 

Total Environmental Kooling were appointed by a major metrology manufacturer to design, supply, install, commission and set to work a close control metrology facility at a multi-national marine engineering facility in Norway.

 

Having agreed the design, all components were shipped to Norway, where our team of specialist builders, electricians and air conditioning engineers constructed the 13 metre by 8 metre chamber and fitted the ventilation ductwork and base electrical services by 23 July , a month ahead of programme.

 

Commissioning took place in mid-August, following the installation of the specialist measuring equipment for which the facility was designed.

The space is controlled at 20OC +/- 1OC  and humidity at 45% +/- 10%.

Close Control, CMM Room, Clean Room Installation

PLC Clients

We design and install air conditioning services to provide temperature controlled office, manufacturing and measurement facilities for  several large plc clients.

The latest air conditioning technology means that heat recovery technology can now be designed into unitary air conditioning systems.

Heat Recovery

Our Work

Home